Several trades, one floor

Imagine walking through a hospital room before its walls go up. The door swing is marked on the concrete. So is the partition, and so is the point where a pipe should enter. A layout printer takes these marks from a coordinated drawing. The people who will frame the wall and install the pipe can stand together at the crossing and settle a question before either starts work.

The surveyor still has the first move

A robot needs to know where the drawing sits in the real building. An operator relates it to surveyed control points, selects the approved drawing revision and starts the print. A displaced reference or an old drawing can produce beautifully clear marks in the wrong place. That makes a check against a known column particularly valuable on the first run.

Sources and further reading